Sunday, July 3, 2011

Race time!

Waiting for our turn.
Some last-minute reinforcing.

Cool other boat - the Copter but they raced mean!

Those covetted trophies.

Still waiting...

Rolling down to the launch.

This one's out of order but we're practicing our turns by shifting mass.


Just in the water here.

Starting out.

Look at our nice wake!

Posted by Picasa

Off to the Regatta!

Neighbor Rob insisted we christen the wheel - and provided the bottle (which was pre-scored).
Did we mention it's green?

Note: this circular shape is not in any way associated with the letter "O" - at least as it might relate to college sports.

Delivered to the lake!

Posted by Picasa

An Evening Off

Took Friday evening off from construction to hit the Downtowner's street fair. Took the prototype with us and after getting stuck in a traffic snarl (injury accident - the guy getting CPR did survive), we made it down town.

Here's some of the competition enjoying the wheel.
(Beth)


(not sure...)


The Dog!


Some Cheerleaders.
I tried to get Marshall to "help" them but he wasn't interested - must still have cooties at age 9.


Ok, DON'T TRY THIS AT HOME! Thanks to Highlander Cycling for lending us the little bike.


Posted by Picasa

Construction Continues

Gotta do a little Vanna White move - last load of boxes & treads.
Got the two halves together & drug out of Rob's shed.

Tipped it over, ready for reinforcement - then we'll roll it home (about 1 city block).

Now it's primed - the primer was too thick for a sprayer so this took about 5 hours to get all the corners. Ugh. This was about 1:45pm on Friday - running a bit behind.

Posted by Picasa

Thursday, June 30, 2011

Final days of construction!

On Tuesday, Marshall and I finished the step supports - 44 of them, nicely 3-ply laminate with only one seam.

Wednesday night, Danny Darnell came up to help. We quickly put him to his knees drawing a circle on the garage floor (to align the discs). I joked about adding more than just the 7 & 9 foot diameter circles - creating a target. Hint: Don't try to use string - circles won't be even.


Finished circles - very nice!

On Thursday, Marshall and I connecting boxes (we made 88) to the step supports. Nicely done! We got 23 together and trucked them over to Rob's barn. Sharon showed up just as we were about to glue it up so rather than letting Marshall go, we made her help glue! Thanks Sharon!

Back in the garage, neatly stacked boxes are falling everywhere. Actually, Marshall thought it would be fun to have them collapse on him - it was!

Moment of dread and panic - I thought I needed two more boxes! Ugh! Turned out I didn't = PHEW - I had folding & gluing the things.

6:00pm, the box supply is dwindling, you can see the back of the garage!

A second stack of boxes + step supports is ready to go - just needs to dry.

Here's half of the wheel! We used the rope to tighten it all together, plus bricks to weigh it down. Marshall walked around it to compress things & get the glue to stick better. Faith took a ride over later to check it out and add more bricks.


As of 7:40pm on Thursday, we're waiting for glue to dry and for Jami to arrive. She's purchasing paint - making a command decision because Fred's computer can't figure out how to do brighter colors with the drab deck & patio paint base. We'll paint it in the morning!

What's left to do?
1. Glue up the 2nd round of boxes & step supports.
2. Glue on the discs & connect it together.
3. Fold up our walkways & glue down.
4. End-cap the discs with silicone. Outer coating with 3" gorilla tape.
5. Caulk at will - we've got lots.
6. Paint.
7. Build a carrier for the car. I'm planning to build a rack and ramp using some 2x4s.
8. Sew up some squirrel tails!
9. Get to the lake on time & have a great day on Saturday.

I think we might actually get to go to bed on Friday night this year!
Posted by Picasa

Building the Components.

Here's Marshall getting ready to glue in the inserts for our step supports. We need 44 of these.



Now we're also folding up custom boxes (with a symmetric trapezoidal taper
and internal fold (origami style). 4 of these boxes will float 343 lbs. We expect to have 8 in the water plus 8 more partially submerged - floating ~1200 lbs.

We need 88 of these (ugh - very tedious!).





We also have a supervisor - she's got her baby. Only ran off 3 times so far - so sneaky for a big dog, just glides out the garage door behind you.













Quick trip to Woodland to get some photos for a slide show. Dennis was kind enough to share his military vehicle collection with us - Marshall was extatic and must have killed hundreds of enemies!





Posted by Picasa

Tuesday, June 21, 2011

It begins again - Pirate Squirrel Wheel - 2011!

Today was a big day. We started with lesson on levers & the fulcrum (not pictured). Then we rebuilt our second table. Marshall had his first lesson on the chop saw - very careful guy, also good at cutting - within 1/32 by his 2nd cut.




Marshall's getting pretty good with the impact drill.
On to making the template for the disc segments. Marshall's sanding here.

Cutting out stacks of disc segments - we cut over 80 of them today.

Making faces...















Here's our pile of disc segments - they will become three 4-ply wheels, 7' ID, 9'OD. Marshall successfully cut out the last several with the reciprocating saw.















Just doing some math on a handy surface...


At the end of the day we'd cut out all the pieces for the discs and the steps - the gluing will probably start tomorrow, we need to design a cardboard folder too. They also delivered a logging machine for next door - of all goes well I might get a Mt. St. Helens view for a few years.

Lunch? We only wanted to eat 1/2 pizza with our salads. To avoid eating too much, the frozen pizza went through the chop saw! Now there's another half for tomorrow.
Posted by Picasa